Location: Orange Cove, California
Scope: Upgrade of an existing wastewater treatment plant
Project Summary: We provided and installed UL508A control panels, Allen Bradley MCC and switchgear as well as programmed the PLC and HMI to interface with the existing SCADA system onsite.
This project was another recommendation referral from a general contractor. We pride ourselves in delivering high-quality engineering for any size or complexity with a reputation unmatched among competitors who specialize solely in electrical or automation systems. The complexities inherent within such a system as complex as wastewater systems would challenge anyone but not our expert teams – our qualifications have been proven time after time year after year. Wastewater treatment systems are exceptionally complicated and regulated requiring the best engineers to design safe and reliable systems. All project management, design and engineering expertise was completed by our sister company, ICAD Automation to ensure all designs met our high-quality standards.
We pride ourselves on our ability to supervise large-scale government projects and deliver quality engineering and electrical work on projects like this that often require creative engineering and industry experts to deliver. – Joel Ratto, General Manager, ICAD Automation
With SCADA systems, industrial and municipal organizations can maintain efficiency and process data for smarter decisions. Our expert engineers understand these critical components in order to design against any unique application that might arise out of it – which is why we offer complete end-to-end service with onsite engineering available to troubleshoot potential issues if needed while also conducting smooth handoffs directly to the local team. In this particular project, our team has continued to be involved in upgrades and supervise repairs to faulty equipment. Our end-to-end expertise allows us to ensure every need is met on each and every project.